In brief
Deploying the Oracle HCM Cloud recruitment module isn’t something you can wing. Audrey CORBELLINI and Grégory VIGNE, senior consultants at SQORUS, share six key tips for a successful implementation: rigorously define HR processes, prioritize native configuration over custom development, address data quality and GDPR compliance early on, bring in the right talent from the start, finalize the project scope, and, finally, incorporate change management as early as possible. A practical guide to approaching your HRIS project with confidence.
While the Oracle HCM Cloud recruitment module provides a powerful engine for streamlining your hiring process, its implementation is far from being a simple IT formality. In reality, the success of such a project depends not only on the technical configuration, but also on the essential scoping phase that takes place well in advance.
Audrey Corbellini and Grégory Vigne, senior consultants at SQORUS, share their recommendations for smoothly preparing for and deploying theOracle HCM Cloud recruitment module.
What are the organizational prerequisites for successfully implementing the recruitment module in Oracle HCM Cloud?
The successful implementation of a new tool depends first and foremost on the maturity and clarity of existing HR processes.
Even before getting into the technical details, a rigorous scoping phase is essential to understand where we’re starting from and where we want to go. This involves, in particular, conducting gap analyses between your current methods and the standards offered by the solution. To achieve this, it is necessary to define a “Core Model” by aligning recruitment processes across different entities (or countries) before attempting to digitize them.
In this structural approach, legal requirements—which, by their very nature, cannot be changed—must always be prioritized and take precedence over mere work habits or local preferences.
Audrey CORBELLINI
Senior HRIS Business Analyst
Beyond the processes themselves, proper scoping is the very first step in change management. It provides an opportunity to gently introduce the tool and familiarize business units with new concepts, which allows the project to progress much more smoothly thereafter
How can we strike the right balance between standard settings and requests for specific configurations?
When faced with a new tool, users naturally tend to want to replicate their old processes. But clinging to old habits is a costly trap, as it requires an increasing number of custom developments to tailor the system to specific needs. What’s more, Oracle’s solution evolves with quarterly version updates: a system that’s overly customized requires more maintenance after the project is complete and would forfeit the benefits of the tool’s new features introduced in these updates.
Therefore, rather than imposing complex changes on the solution, it is often better to explore all the tool’s capabilities by adapting one’s own methods using the native settings. It is therefore essential to prioritize requests by ensuring that all business-specific requirements are thoroughly evaluated and prioritized before being accepted.
Gregory VIGNE
Senior HRIS Consultant
This is precisely where the solution’s expertise makes a difference. In the heat of a workshop, when faced with a very specific business requirement, a business analysis consultant must be able to respond immediately with a native workaround. The goal is to reassure the user by demonstrating that their need can be met just as effectively without requiring complex custom development.
What are your recommendations for planning ahead and ensuring the technical aspects and data quality of the project?
Data is the lifeblood of an HRIS project, and this aspect is almost always underestimated by companies. It is very rare to start from scratch, so it is necessary to manage legacy systems, which requires a solid migration and data cleansing strategy.
This strategy involves, in particular, carefully managing the transition for positions currently being recruited. A decision must be made very early on as to whether to keep job postings active in the old system or to migrate everything to the new one, with the goal of avoiding running two parallel processes at all costs.
Furthermore, migrating candidate data from one system to another requires special attention to the GDPR, as it often involves obtaining new consents and adhering to strict compliance requirements that must be anticipated.
“Switching to a new tool is the perfect opportunity to do as much cleaning up as possible. During workshops, we often find that there is data whose purpose no one understands. We need to identify the key data and discard what is no longer relevant.”
What types of personnel are essential to bring on board as early as the preparation phase?
A project of this magnitude does not rest solely on the integrator’s shoulders. The client company must assemble a multidisciplinary team capable of making firm decisions—ranging from a dedicated project manager to the IT department for the interfaces, as well as recruiters and potentially the employer branding team for the careers site.
Within this team, one key role is often overlooked: Project Management Support (PMS). Serving as a true bridge between the technology and business needs, this role must be properly defined. Furthermore, the AMOA must have a thorough command of Oracle HCM Cloud to effectively challenge the business.
At the same time, the role of the project manager (or Product Owner) is crucial. The project manager must demonstrate leadership to prevent the creation of a system that is costly to maintain and fiercely protect the project scope against business requests.
“Having a Product Owner on-site at the client’s location is a real asset. During workshops, when users express regret over the old system, the Product Owner is the one who will advocate for the new solution, reassure the teams, and demonstrate that the new tool often offers much better approaches.”
What is the most common mistake made during preparation, and how can it be avoided?
In addition to the chronic underestimation of the project’s workload, the main pitfall lies in an overly superficial scope definition. A scope that is poorly defined early on inevitably leaves the door open to countless last-minute requests during implementation.
This results in budget overruns, schedule delays, and internal tensions.
To guard against this, it is important to lock down the scope by clearly defining what is part of the initial project and what will be addressed later during the ongoing operations phase. This rigor requires the establishment of strict governance capable of maintaining meticulous traceability of all decisions made in order to avoid constant backtracking that hinders deployment.
“The classic mistake is not having done enough work on the data and standardization before getting started. The implementation phase is no longer the time to get bogged down in thoughts about data and standardization; that puts the project at risk.”
Expert Council: Planning for Change Management
Even with the best design and flawless technical execution, end-users’ adoption of the tool is ultimately the deciding factor. Resistance to change is natural: some people will always prefer to stick with their old Excel files out of habit. This resistance sometimes persists even when there is concrete evidence that the new tool, by automating processes, would save them valuable time on a daily basis. That’s why anticipating resistance and providing genuine, personalized support—focused on demonstrating real-world benefits—are essential to the project’s overall success.
“We must not underestimate the power of change management. If there’s no way to technically address a specific issue while staying within the standard, we’ll have to change our habits. And this support for change must begin as early as possible in the project.”
Assessment: Measure the Level of Resistance to Change
Are you leading a transformation project? Before picking up the pace, it’s essential to pinpoint exactly where the obstacles lie and tailor your actions to each key stage.